Compliance with NR/L2/OHS/019 Issue 13

This document demonstrates how Accurail complies with Network Rail Standard NR/L2/OHS/019 Issue 13 - Safety of People at Work on or Near the Line, effective from 06 December 2025.


Standard Overview

NR/L2/OHS/019 controls access, egress, walking and working on or near the line, and manages train movement risks to people working on Network Rail infrastructure. Accurail is designed to support full compliance with this standard throughout the Safe Work Pack (SWP) lifecycle.


Accountabilities and Responsibilities

Section 3: Role Separation Requirements

The standard mandates that verifying and authorising the SWP must be undertaken by different roles in the planning process.

Accurail Compliance

Accurail enforces role-based access control ensuring:

  • The Planner creates the SWP
  • The Person in Charge (PIC) verifies the SWP
  • The Responsible Manager (RM) authorises the SWP

One person cannot carry out all accountabilities of Planner, Verifier, and Authoriser.

Standard RequirementAccurail Implementation
Verifier and Authoriser must be different peopleSystem prevents same user from both verifying and authorising an SWP
RM shall not authorise until verified by PICAuthorisation button disabled until verification is complete
RM and Planner recommended to be different peopleAudit trail tracks all role assignments

Responsible Manager Requirements

Section 4.2.1: RM Duties

The RM is accountable for the preparation of Safe Systems of Work (SSoW) and must provide specific information to the Planner.

RM Request Process

Accurail supports the RM in fulfilling their duties under section 4.2.1:

RM DutyAccurail Feature
Identify the workWork request forms capture task description and scope
Appoint Planner and PIC with site/task knowledgeUser assignment with competency tracking
Provide time and resource for planningShift scheduling and deadline management
Provide ELR/line of routeLocation data integration
Provide mileage (start/finish) with access/egress pointsMileage fields
Specify task, number of people, tools/equipmentResource allocation section in SWP creation
Specify time requiredDuration fields with possession timing validation
First aid arrangementsFirst aid section with appointee details
Gender specific welfare facilitiesWelfare section with gender-specific options

Section 7.1: RM Responsibilities

ResponsibilityAccurail Compliance
Be accountable for SSoW preparationFull audit trail of all RM actions
Decide work prioritisation and hierarchyDashboard view of all pending authorisations
Appoint Planner and delegate SWP preparationAssignment workflow with notification system
Appoint PIC to plan and implement SSoWPIC assignment with competency verification
Review and authorise or reject verified SWPAuthorisation workflow with approve/reject options

Verification Requirements

Section 4.2.4: Verify the SWP

The PIC shall only verify the SWP when they have confirmed specific requirements.

Mandatory Verification Checklist

Accurail enforces completion of all verification requirements before the verification can be submitted.

PIC Verification Checklist

The Person in Charge must confirm the following before verification:

RequirementResponse Options
Protection / Warning arrangements (hierarchy of control) suitable for the workYes / No
COSS Signature and EndorsementYes / No
Task / Site Risk and controlsYes / No
Any necessary permit to work arrangements identifiedN/A / Yes / No
The welfare facilities have been identified and are appropriateYes / No

Rejection Criteria

If any of the above statements are answered NO, the SWP must be rejected and returned to the Planner.

Timing Requirements

RequirementAccurail Enforcement
Verify at least a shift in advanceSystem tracks verification timing with deadline alerts
Recording of same-shift verificationsAuthority number generation for exceptions

Authorisation Requirements

Section 4.2.5: Review and Authorise the SWP

Verification Prerequisite

The RM shall not authorise the SWP until it has been verified by the Person in Charge. Accurail enforces this with system controls.

RM Authorisation Checklist

The Responsible Manager must confirm the following before authorisation:

RequirementResponse Options
Work content is understood by the person in chargeYes / No
Necessary competence within team to undertake taskYes / No
Risk controls are suitable and sufficientYes / No
The appropriate hierarchy of Safe System of Work has been selectedYes / No
Any additional specific controls identifiedN/A / Yes / No
The welfare facilities have been identified and are appropriateYes / No

RM Authorisation

The Responsible Manager's authorisation confirms this SWP is complete and includes any specific additional information required to manage risk on site. The RM cannot be the same person as the verifier.

Rejection Criteria

If any of the above statements are answered NO, the SWP must be rejected.

Timing Requirements

RequirementAccurail Enforcement
Authorise at least a shift in advanceDeadline tracking and alerts
Record same-shift authorisations with authority numberAuthority number auto-generation with reason capture

Section 4.2.6: Cyclical and Repeated SWPs

RequirementAccurail Implementation
SWP identified as cyclical or repeatedSWP type classification field
Maximum 6 months validity (warning SSoW)Automatic expiry date calculation
Maximum 12 months validity (protection SSoW)Expiry alerts and re-verification prompts
PIC performs final acceptance checkOn Site acceptance workflow

SWP Content Requirements

Section 4.2.3: Contents of the SWP (Table 3)

Accurail ensures all required SWP elements are captured:

Task/Site Risk Controls

Required ElementAccurail Section
SWP Validation Form NR/L2/OHS/019/F01F01 auto-generated and embedded
Task risk information and controlsTask Risk Control Sheets integration
Site (location) risk information and controlsSite risk section with NHD data
Permits (electrical, isolation, hot works)Permits section with type selection
Welfare facilities and locationWelfare tab with gender-specific options

Operational Risk Controls

Required ElementAccurail Section
Part-completed RT9909RT9909 form generation with pre-population
Part-completed NR3180 (where applicable)NR3180 form generation for line blocks
Possession arrangements/protection detailsPossession details section
Safe access and egress including walkingAccess/egress with walking route planning
Sectional Appendix extractsNESA integration for location data
National Hazard Directory extractsNHD data auto-populated
Signalling or track diagramsDiagram data section with upload capability
Emergency arrangementsEmergency section with A&E details

Hierarchy Compliance

Section 4.2.3.2: Hierarchy of Control (Table 4)

Accurail enforces the hierarchy of control for operational risks:

PositionSSoW TypeDescriptionAccurail Validation
1Safeguarded siteEvery line blocked except 5mph movementsHighest priority selection
2Fenced siteSuitable barrier between site and open linesBarrier type and distance validation
3Separated siteAt least 2m from nearest running lineSite Warden requirement calculation
4Warning systems - permanentTrain activated equipmentEquipment specification fields
5Warning systems - portablePortable train activated equipmentEquipment allocation tracking
6Lookout warningMaximum 25mph or temporarily restrictedCompany Director approval workflow

Lookout Warning Restrictions

Accurail enforces Company Director approval requirements for Lookout warning SSoW, including prohibition on unplanned use and incident response.

Section 4.2.3.3: Walking Hierarchy (Table 4a)

PositionWalking ComponentAccurail Implementation
1SSoW per Table 4Walking component linked to main hierarchy
23m from nearest line (Lineside)Distance validation with SSOW requirement check
32m from nearest line (100mph+)Risk assessment attachment mandatory
41.25m from nearest line (100mph or below)Risk assessment attachment mandatory

Reports and Monitoring

Section 6: Monitoring and Assurance (Appendix B)

Accurail provides comprehensive reporting to support compliance monitoring:

Level 1 Assurance - RM Requirements (B.4.2)

RM Review RequirementAccurail Report
10% of completed SWPs (or 50 minimum if >500/period)Built in compliance questions
Planned unassisted Lookout SWPs with justificationLookout SSoW report with reason analysis
Planned SWPs not implementedNon-utilisation report
Used SWPs not returnedNon-returns report
SWPs with amendments or changesAmendment tracking report
Planner/PIC collaboration confirmationCollaboration audit trail
PIC changes before shiftSame-day PIC change report
Lower SSoW authorisations (5.1.5)Hierarchy deviation report

Reports Dashboard

Accurail provides:

  • 10% Check Reports - Automated selection of SWPs for review per NR period
  • Non-Returns Management - Tracking of unreturned SWPs with escalation
  • Authority Number Register - Log of all exception authorisations
  • Lookout SSoW Register - All Lookout working with Company Director approvals
  • Hierarchy Deviation Report - Instances of moving down the hierarchy
  • Verification Timing Report - Same-shift verifications with authority numbers

Changes After Authorisation

Section 5: Post-Authorisation Changes

Section 5.1.1: Change of Person in Charge

RequirementAccurail Implementation
New PIC chosen by RM for unforeseen absencePIC reassignment workflow
Authority number issued by RMAuto-generated authority number
RM records reasons for changeMandatory reason field
Record all same-shift PIC changesException report generation

Section 5.5: Moving Down the Hierarchy

RequirementAccurail Implementation
Only move down if safest available optionJustification capture mandatory
RM authorisation requiredIn-app authorisation workflow
Authority number issuedAuto-generated authority number
Reference to Table 4 for approval levelsSystem validates approval requirements

Completion and Return

Section 5.7: Completing and Returning the SWP

RequirementAccurail Implementation
Sign off completion (NR/L2/OHS/019/F01)Digital sign-off on F01
Return used/unused SWP to PlannerDigital return workflow
State reason for unused SWPsReason code and free text capture
Record unexpected/unplanned obstaclesObstacle reporting section
Share best practice ideasFeedback mechanism to Planner/RM

Appendix A: SWP Minimum Contents

Accurail ensures every SWP contains:

Task/Site Risk Controls

  • SWP Validation form NR/L2/OHS/019/F01
  • Task risk information and controls (TRCSs, WARAs, WPPs, TBSs)
  • Site (location) risk information and controls
  • Permits (where applicable)
  • Welfare facilities and location

Operational Risk Controls

  • Part-completed RT9909
  • Part-completed NR3180 (where applicable)
  • Possession arrangements/protection details
  • Safe access and egress including walking
  • Sectional Appendix extracts
  • National Hazard Directory extracts
  • Signalling or track diagrams
  • Emergency arrangements

Compliance Summary

Full Compliance Statement

Accurail is designed to fully support compliance with NR/L2/OHS/019 Issue 13.

Accurail compliance includes:

  • Role separation enforcement between Planner, Verifier, and Authoriser
  • Mandatory verification checklists aligned with section 4.2.4
  • Authorisation controls preventing approval of unverified SWPs
  • Hierarchy enforcement with justification capture for deviations
  • Comprehensive audit trails for all actions and decisions
  • Reporting capabilities supporting Level 1 and Level 2 assurance
  • Digital forms (F01, RT9909, NR3180) meeting standard requirements

Document Information

DetailValue
Standard ReferenceNR/L2/OHS/019
Issue13
Standard Date06 December 2025
Compliance Date06 December 2025
This Document Version1.0
Last UpdatedDecember 2025

Questions?

For queries about Accurail's compliance with NR/L2/OHS/019, please contact your Accurail account manager or email support@accurail.co.uk.